Planning an Office Fitout: A Flooring Checklist

From subfloor to handover, the flooring decisions to get right in an office fitout.

By the AB Flooring teamUpdated 5 min read

Flooring is one of the last trades in a fitout but one of the most visible. Planning it early avoids clashes with your program and budget surprises.

Before the fitout

  • Confirm subfloor condition and levelling needs
  • Check moisture in ground-floor slabs
  • Choose products for traffic, acoustics, and slip ratings

During the program

Flooring should be scheduled after wet trades and painting, but coordinated with skirting, doors, and workstation installs. Sequencing matters to protect the new floor.

At handover

Keep spare tiles for future repairs, confirm cleaning guidance, and check transitions and thresholds are finished cleanly for practical completion.

Items that are often missed

  • Trims and transitions between carpet tiles and vinyl
  • Floor boxes, power poles and penetrations
  • Entry matting at lifts and external doors
  • Spare tiles and planks for future repairs
  • Protection of new floors from following trades
  • Maintenance information for the building manual

Slab readiness in new and refurbished buildings

New slabs may still be releasing moisture, and refurbished floors may carry old adhesives, screed patches or damage. Both affect the flooring program. Build in time for moisture checks and preparation, and make sure the quote lists them. Our subfloor preparation guide explains what's involved.

Coordinating with other trades

Flooring typically follows ceilings, walls and painting, and happens before or around joinery depending on the detail. Agree the sequence with the builder early, and make sure electricians and data contractors know when floors are going in so floor boxes and cabling are in place. Our office fitouts service covers how we work with builders.

Lead times and the critical path

Flooring often lands late in a fit-out program, which makes it easy to overlook early. But some commercial products, particularly custom colours, large quantities or specific ranges, have lead times that can affect handover if they're ordered late. Locking in selections and confirming availability early protects the program.

Slab readiness is the other critical item. On new or refurbished floors, slabs may need moisture testing, grinding of old adhesives or levelling before anything can be laid. If that isn't programmed, flooring crews arrive to a floor that isn't ready, and the knock-on delays affect joinery, furniture and IT installs. A short pre-start inspection, in which we check flatness, moisture risk and contamination, lets the builder plan any preparation into the program. For projects in operating buildings, see our guide to minimising downtime.

Fit-out flooring checklist by stage

StageFlooring tasks
DesignSelect products, confirm finishes, set out zones and transitions
Pre-constructionConfirm lead times, measure, check building access rules
Early worksCheck slab moisture and flatness, plan preparation
InstallSequence with other trades, lay in zones, protect finished areas
Pre-handoverInstall trims and skirting, clean, check against the plan
HandoverProvide spares, maintenance guides and product documentation

Checklist

Often missed on office fit-outs

  • Floor boxes and data outlets set out before the flooring goes down.
  • Transitions between carpet tiles and vinyl in kitchens.
  • Lift lobby and corridor protection rules.
  • Chair mats or hard flooring under rolling chairs.
  • Storage for spare tiles after handover.

AB Flooring works to your construction program and coordinates with other trades. Request a commercial fitout quote.

FAQs

Frequently asked questions

When should flooring be ordered for a fit-out?

As early as the design allows. Some commercial products have longer lead times, especially custom colours or large quantities. Early selection helps protect the program.

Can flooring go in before the joinery?

It depends on the design and product. Sometimes flooring goes in first and gets protected. Other times joinery goes in first and flooring is cut around it. We agree the sequence with the builder or project manager.

Do you work with builders and project managers?

Yes. We can work to a builder's program, attend site meetings and coordinate access, deliveries and protection with other trades.