AB Flooring logoAB Flooring

How to Prepare Your Home for Flooring Installation Day

A simple checklist to get your home ready so the install runs smoothly and finishes faster.

By the AB Flooring teamUpdated 4 min read

A little preparation before your installers arrive helps the job run smoothly, finish faster, and protect your belongings.

Before the day

  • Clear furniture from the rooms being floored (ask us what we can move)
  • Remove breakables and valuables
  • Empty wardrobes if built-ins are being floored around
  • Plan for pets to be kept clear of the work area

On the day

Keep access clear for materials, allow parking for the crew, and expect some noise from prep and cutting. Good ventilation helps if adhesives are used.

After install

We'll advise how soon you can walk on and reload the floor with furniture, and share care tips to keep it looking new.

A simple checklist

  • Clear small items, decor and anything fragile from the rooms.
  • Clear wardrobe floors and low cupboards in affected rooms.
  • Confirm who is moving furniture and appliances.
  • Disconnect and move the fridge and washing machine if needed, or arrange it with us.
  • Arrange parking and access for the crew and materials.
  • Plan for kids and pets to be away from work areas.

Materials and acclimatisation

Some products need to sit in the room for a period before installation so they adjust to the temperature. We'll tell you if your product needs this and how long. Keep the home at a normal living temperature during that time.

After the install

  • Follow the advice on when you can walk on the floor and move furniture back.
  • Put felt pads on furniture before it goes back.
  • Wait before heavy cleaning on glue-down floors, as advised.
  • Keep spare planks and the product details for future repairs.

Our cleaning guide covers the routine to start once the floor is settled.

Living in the home during the install

Most flooring jobs happen while people are living in the home, so it's worth planning where everyone will be. If the kitchen is being floored, plan meals that don't need it for the day. If bedrooms are being done, agree the order so there's always somewhere to sleep. Keep a clear route to the bathroom. With pets, a day at a friend's place or a closed-off room away from the noise is usually easiest for everyone.

Think about the hours after installation too. Some products and adhesives need time before heavy furniture goes back or the floor is mopped. We'll give you specific guidance for your floor. Have felt pads ready to fit before furniture returns, and lift items rather than sliding them. A little planning turns install day from stressful into straightforward. For long-term care once you're settled, see how to clean vinyl plank flooring.

Countdown to installation day

WhenWhat to do
A week or two beforeConfirm the date, access, parking and who's moving furniture
A few days beforeClear wardrobes, low cupboards and breakables. Arrange pet care
The day beforeClear floors, disconnect appliances if agreed, vacuum
On the dayBe available at the start to confirm rooms, layout and trims
After installFollow the guidance on furniture, cleaning and curing time

Checklist

Install-day checklist

  • Clear driveway or parking for the van.
  • Pets and kids kept away from the work area.
  • Valuables and fragile items removed.
  • Clear path from the entry to the work area.
  • Power and lighting available.

AB Flooring makes installation day easy with clear communication from measure to handover. Book your free measure.

FAQs

Frequently asked questions

Do I need to be home during installation?

It helps to be there at the start to confirm rooms, layout and trims, and at the end for a walk-through. In between, you just need to arrange access with us.

Will you move furniture?

That's agreed on your quote. Some clients clear the rooms themselves, and others ask us to include furniture moving. Tell us about heavy or delicate items in advance.

When can I put furniture back?

It depends on the product and the install method. Click floors can often take furniture soon after. Glue-down floors may need adhesive curing time. We'll give you specific guidance at handover.

Call