Two quotes for "the same" floor can differ by thousands — usually because they include different things. Here's how to compare like for like.
What a complete quote covers
- Product, grade, and quantity (including wastage allowance)
- Subfloor preparation and levelling
- Underlay, adhesives, and accessories
- Removal and disposal of old flooring
- Trims, transitions, and skirting where relevant
Red flags
Be wary of quotes that omit prep, exclude disposal, or leave 'to be confirmed' items. Those gaps often reappear as variations mid-job.
A worked example of quote structure
A complete residential quote might be laid out like this: product and quantity; removal of existing carpet and tiles; grinding and levelling of the slab in the kitchen; underlay; trims at four doorways and a reducer to the bathroom tiles; stair nosings; furniture moving for two rooms; and disposal. Each line should be clear enough that you could ask for it to be removed or changed.
Assumptions and exclusions
Good quotes state what they assume, such as the subfloor being sound, access being available and the rooms being clear, and what they exclude, such as moving appliances or repairing damaged boards. Read these carefully; they're where most surprises come from.
Comparing two quotes
- Check the product name and grade are the same, not just 'vinyl plank'.
- Compare preparation lines; this is where quotes differ most.
- Check whether removal, disposal and trims are included.
- Check for GST and whether the quote has an expiry date.
If a quote is much lower, ask what it leaves out. Our cost guide explains the main drivers.
Reading between the lines of a cheap quote
When one quote is much lower than the others, look for what's missing rather than assuming it's a better deal. Common gaps are preparation (no mention of grinding, levelling or priming), removal and disposal of old floors, trims and nosings, furniture moving, and a realistic waste allowance. Sometimes a different, lower-grade product has been quoted. Sometimes the quote assumes perfect site conditions that don't exist.
None of this is necessarily dishonest, because quotes are often based on assumptions. But you should know what those assumptions are. Ask each installer to confirm what's included for the same rooms, and request an itemised breakdown. Once quotes cover the same scope, the comparison becomes fair, and the cheapest quote may not be the cheapest result. If you're deciding between product options at the same time, see is cheap flooring worth it.
Anatomy of a clear quote
| Section | What it should show |
|---|---|
| Product | Brand or range, colour, quantity including waste allowance |
| Preparation | Grinding, levelling, patching, priming, moisture treatment if needed |
| Removal | Existing floor lift-out and disposal |
| Installation | Method (glue-down or click) and areas covered |
| Trims and finishing | Transitions, edge trims, nosings, skirting or cove if included |
| Assumptions | Access, timing, furniture, site conditions |
| Exclusions | Items not included, such as painting or door trimming |
Checklist
Before you accept
- Check every room you want floored is listed.
- Confirm preparation is included and explained.
- Check who moves furniture and appliances.
- Confirm timing, access and any after-hours requirements.
- Ask what happens if site conditions differ from the quote.
AB Flooring provides clear, itemised quotes so you know exactly what you're paying for. Request yours after a free measure.
FAQs
Frequently asked questions
What's a waste allowance?
It's extra material for cuts, pattern matching and offcuts. The right allowance depends on the room shapes and the product layout. It should be included rather than left for you to work out.
Can the price change after I accept?
A clear quote states its assumptions. If conditions turn out different, such as hidden damage under old flooring, a good installer explains the change and gets your approval before going ahead.
Why does my quote list preparation separately?
So you can see exactly what your floor needs and why. It also makes comparing quotes fairer, because some quotes leave preparation out.
